P
Professional epoxy garage floor by PSR Coatings Gold Coast
Gold Coast's Trusted Epoxy Specialists

Epoxy Flooring
Gold Coast

Premium epoxy floor coatings for garages, patios, driveways, and workshops. 15+ years experience. 4.9★ rated by Gold Coast homeowners.

Every job starts with diamond grinding, crack filling, and moisture testing before a single drop of epoxy goes down. That's why our floors last decades, not years.

  • Free, no-obligation quotes
  • We respond within 24 hours
  • Fixed pricing — no surprise extras
  • 4.9★ rated by Gold Coast homeowners
Prefer to call?  0497 859 206

Get Your Free Quote

Takes 30 seconds. No spam, ever.

1
2

The Difference We Make

Your floor deserves better than bare concrete.

We transform dull, cracked, dusty concrete into tough, good-looking surfaces built to last — without the mess or guesswork. Premium materials. Experienced hands. Results you'll actually be proud of.

The difference isn't just visible — it's in the prep work underneath. Every job starts with diamond grinding, crack filling, and moisture testing before a single drop of epoxy goes down.

Get My Free Quote →
Bare concrete floor before epoxy coating
Before
Finished epoxy garage floor after PSR Coatings installation
After

Why Choose PSR

Gold Coast Epoxy Flooring Done Right

Most epoxy jobs that fail do so because of poor surface preparation or the wrong product for Queensland conditions. With 15+ years in the coatings industry, Padraig knows what works — and what doesn't.

Built for Queensland

We specify UV-stable polyaspartic topcoats as standard on all outdoor applications. Standard epoxy resin topcoats yellow and fail under Queensland's UV — we never use them outdoors.

Moisture Vapour Barrier

Gold Coast's coastal humidity is the #1 cause of epoxy delamination. We test for moisture and apply a vapour barrier on every job where required — not as an upsell, as standard practice.

Diamond Grinding Prep

Every single job starts with diamond grinding. It's the only way to properly open the concrete profile for adhesion. Operators who skip this step produce floors that peel.

4.9★ Google Rated

18 Google reviews and counting. Our rating comes from showing up on time, doing the work to spec, and leaving a clean site — every time.

Fixed-Price Quotes

What we quote is what you pay. No variations, no 'extras discovered on the day'. If we quote a price, that's the price — full stop.

Locally Owned

We're based on the Gold Coast — not a Brisbane franchise with a local page. We know the suburbs, the conditions, and the expectations of Gold Coast homeowners.

Padraig diamond grinding a concrete floor during surface preparation

Surface prep in action

Diamond grinding before every single job — no exceptions

How It Works

From Quote to Completion

01

Free Quote

Call or submit your details online. We respond within 24 hours with a clear, fixed-price quote. No upsells, no pressure.

02

Site Assessment

We assess your concrete condition, check for moisture issues, and confirm the best system for your space and usage.

03

Surface Preparation

Diamond grinding opens the concrete profile for maximum adhesion — the step most cheap operators skip. We never do.

04

Coating Application

Primer, base coat, decorative layer (flake, metallic or solid), and UV-stable topcoat — applied to manufacturer spec.

05

Handover

We leave your site clean and tidy, walk you through care instructions, and you're ready to use the space within 24–72 hours.

Finished epoxy garage floor
Epoxy pool surround
Epoxy workshop floor
Commercial epoxy floor

Customer Reviews

What Gold Coast Homeowners Say

4.9 / 5(18 Google Reviews)

Had epoxy flooring done in our garage and couldn't be happier with the experience. The owner was polite and professional, took the time to create a custom colour mix, and the end result looks great. The job appears very well done — neat, tidy, and everything was cleaned up afterwards. Would definitely recommend.

Rawson Armitage Gold Coast

Padraig and Kayne did an amazing first class job. It was a pleasure to deal with them and they never hesitated in answering any of our questions. I highly recommend this company.

Vanessa Ryan Gold Coast

Great service, very professional and super happy with the finish. Thanks very much!

Nicola Carlisle Gold Coast

Common Questions

Epoxy Flooring FAQ — Gold Coast

How much does epoxy flooring cost on the Gold Coast?
Epoxy flooring on the Gold Coast typically costs between $50 and $100 per square metre for residential applications, depending on the finish and preparation required. A standard double garage (around 36–40m²) is commonly quoted at $2,000–$3,500 fully installed. Decorative finishes such as metallic or flake systems sit at the higher end. We provide free, fixed-price quotes so you know exactly what to expect — no surprises.
How long does epoxy flooring last in Queensland's climate?
Quality epoxy systems installed correctly last 10–20 years in Queensland. The key is using UV-stable polyaspartic topcoats — standard epoxy topcoats can yellow and chalk under Queensland's high UV levels within a few years. We also apply a moisture vapour barrier as standard on Gold Coast jobs, as the coastal humidity is the most common cause of early delamination with cheaper systems.
Is epoxy flooring slippery, especially in wet areas?
Standard high-gloss epoxy can be slippery when wet. For garages, patios, pool surrounds, and driveways we add anti-slip aggregate to the topcoat as standard practice — this creates texture without affecting the appearance. Slip resistance ratings are available on request for commercial applications.
Can epoxy flooring be applied outdoors on the Gold Coast?
Yes, with the right system. Outdoor Gold Coast applications — patios, pool surrounds, driveways — require UV-stable polyaspartic or polyurethane topcoats, not standard epoxy resin, which will degrade in direct sunlight. We use outdoor-rated systems specifically formulated for Queensland's UV and heat conditions. All outdoor quotes include UV-stable product as standard.
How long does epoxy floor installation take?
A standard residential garage (double, 36–40m²) takes 1–2 days: day one for surface preparation (diamond grinding and priming) and the base coat, day two for topcoats. You can walk on the surface within 24 hours and drive on it within 72 hours. Larger jobs, decorative systems, or floors requiring significant repairs may take longer — we'll confirm timeframes in your quote.

Where We Work

Epoxy Flooring Across the Gold Coast & Brisbane

We're based on the Gold Coast and service all surrounding suburbs, as well as Brisbane and the northern Gold Coast corridor.

Surfers ParadiseBroadbeachRobinaBurleigh HeadsSouthportHope IslandPalm BeachHelensvaleUpper CoomeraPimpamaMudgeerabaVarsity LakesCurrumbinTweed HeadsCoolangattaNerangBenowaAshmoreRunaway BayBrisbane+ surrounding areas

Ready for a Floor You're Proud Of?

Get a free, fixed-price quote. We respond within 24 hours. No obligation, no pressure.